Are you preparing for a new or renovation project for a data center? A simple overlooked finish is your flooring and ensuring that the data center and its immediate area are static free. The following is a checklist when choosing static control flooring:

• Only conductive floors can be grounded. Standard flooring installed with ground strips or conductive adhesive will not offer any static protection.
• Any effective conductive floor can be verified with an ohm meter to determine the electrical resistance of the material. If the material does not pass the ohm meter test than it cannot be grounded.
• Conductive floors should never require any antistatic sprays or waxes to enhance or maintain performance. The conductivity should be achieved by the actual permanent physical composition of the material.
• The floor should reduce static electricity regardless of relative humidity. Ask the supplier specifically about performance in very dry conditions.
• The floor must prevent static buildup in real world conditions without special conductive shoes or shoe straps. When in doubt, ask for independent test data verifying this property. It should be available. The data should come from an installed floor and not from a lab test of new flooring.
• Never assume that a shock-free environment means a static-free environment. A shock-free environment only means that static charges are below 3500 Volts.
• Do the homework up front. It is much more costly to remove an ineffective floor and replace it than it is to do it right the first time. Any mission-critical space is only as secure as its Achilles’ heel.
• Even if your present electronics are immune to static, if at some point in the future they will be upgraded or replaced with state-of- the-art equipment, then static will be a problem. As with any potential security breach, it is always best to plan ahead.

About the Author: David H. Long is with Staticworx www.staticworx.com

More from this author:
Related Articles:
Trackback(0)
Comments (0)Add Comment

Write comment
You must be logged in to post a comment. Please register if you do not have an account yet.

busy

DCJ Digital Magazine

 

What drives a Data Center? Want to know more about Cost vs Efficiency in Data Center Design?

 

To find out and to read more great articles in this issue, CLICK HERE!

 


DCJ SpotlightON

SpotlightON series continues!

The Data Center Journal has the pleasure of presenting it's interview with Lior Bilk, CFO of Hoboken University Medical Center.  Lior discusses his thoughts on DC cooling as well as thoughts on design and efficiency.  To read the the entire interview please make sure to open today's newsletter.  Not subscribed to the newsletter?  Scroll down on this page and submit your email address.  It's that easy!!!!!


 

Register Today!

Get the NEW & IMPROVED DCJ Bi-Weekly eNewsletter! Sign up below!


E-mail Address:

DCJ Jobs

Latest Events

Sun Sep 12 @ 8:00AM - 05:00PM
Data Center Insights Summit
Sun Sep 12 @ 8:00AM - 05:00PM
BICSI Fall Conference and Exhibition
Tue Sep 14 @ 9:00AM - 10:00AM
Cisco Data Center Architecture The Power to Say Yes
Thu Sep 16 @ 8:00AM - 05:00PM
DataCentre Expo
Mon Sep 20 @ 8:00AM - 05:00PM
Data Transfer & Data Breach Notification Briefing
Sun Oct 03 @ 8:00AM - 05:00PM
AFCOM Data Center World
Tue Oct 19 @ 8:00AM - 05:00PM
Grreen Data Centers: NY